The Virtuality 2000 series utilized an advanced magnetic field position tracking system for the Visette and Space Joystick. InsideTrak was the improved model of Polhemus' tracking system, one that fit "inside" the PC (on a single large ISA card).
Knowledge of this system is not required to operate the Virtuality system, but for the sake of documenting this obsolete product, here is its manual.
Manual for Polhemus InsideTrak system
The Virtuality Archive
Documents and ephemera concerning the 1990s Virtuality VR System
Tuesday, September 10, 2019
1000 series Format board updated documentation
Courtesy of Simon Marston at Retro-VR, here is a mirror for his redrawn schematics for the original 1000 series Format board wiring diagram as well as its inboard power supply.
1000 Series Format Board - Schematic (Marston)
1000 Series Format Board Power Supply - Schematic (Marston)
1000 Series Format Board - Schematic (Marston)
1000 Series Format Board Power Supply - Schematic (Marston)
Saturday, September 7, 2019
SD 1000 wiring diagram
Here is an overall wiring diagram for the sit-down 1000 series Virtuality cabinet. As with the Format board drawing, this is a composite of multiple (incomplete) letter size scans, so bits are missing here and there.
SD 1000 Wiring Diagram
This is the last post of documents that has passed through my hands personally. Pretty sure I don't have any more.
SD 1000 Wiring Diagram
This is the last post of documents that has passed through my hands personally. Pretty sure I don't have any more.
Friday, January 1, 2016
Connecting 1000 to monitor
Stray hand-drawn diagram that got separated from the herd.
Graphics card adapter to drive Commodore monitor
Graphics card adapter to drive Commodore monitor
CS 1000 Manual
The manual for the CS 1000, one of the original Virtuality products.
Complete (1 file):
CS 1000 Service Manual
Same manual broken up into chapters:
Chapter 01 - Title and General Info
Chapter 02 - Expality
Chapter 03 - Visette
Chapter 04 - Space Joysticks
Chapter 05 - Connections and Pinouts
Chapter 06 - Tracking Systems
Chapter 07 - Reserved for Future Use
Chapter 08 - Engineering Test System
Chapter 09 - Help Details
This is not the same scan previously hosted by VRtifacts or other sites, but it's probably exactly the same manual.
Complete (1 file):
CS 1000 Service Manual
Same manual broken up into chapters:
Chapter 01 - Title and General Info
Chapter 02 - Expality
Chapter 03 - Visette
Chapter 04 - Space Joysticks
Chapter 05 - Connections and Pinouts
Chapter 06 - Tracking Systems
Chapter 07 - Reserved for Future Use
Chapter 08 - Engineering Test System
Chapter 09 - Help Details
This is not the same scan previously hosted by VRtifacts or other sites, but it's probably exactly the same manual.
Monday, May 18, 2015
Wiring diagrams
Partial schematic for the Format Board on 1000 series Virtuality.
Schematic for a switching power supply; not attributed, but was provided with 1000 series documentation.
Collection of random harnesses, pinouts and schematics for the 1000 series Virtuality:
1. Harness (loom) from Power Supply to Format Board.
2. Pinout for the Space Joystick.
3. Harness from Expality DB15 to Tracker Board.
4. DB9 analog video pinout.
5. Source (tracker) DIN connector pinout.
6. 23-way connector pinout for Backpack.
7. Pinouts for Power Supply connectors.
8. Schematic for AC mains supply to Format Board. Includes audio amps.
9. Layout diagram of Format Board.
10. Diagram showing the range of the tracker Sources, and the absolute minimum space requirements for the game to avoid interference with the field around the Sources.
Schematic for a switching power supply; not attributed, but was provided with 1000 series documentation.
Collection of random harnesses, pinouts and schematics for the 1000 series Virtuality:
1. Harness (loom) from Power Supply to Format Board.
2. Pinout for the Space Joystick.
3. Harness from Expality DB15 to Tracker Board.
4. DB9 analog video pinout.
5. Source (tracker) DIN connector pinout.
6. 23-way connector pinout for Backpack.
7. Pinouts for Power Supply connectors.
8. Schematic for AC mains supply to Format Board. Includes audio amps.
9. Layout diagram of Format Board.
10. Diagram showing the range of the tracker Sources, and the absolute minimum space requirements for the game to avoid interference with the field around the Sources.
Ephemera
1993 Memo and procedures from (EBME) Edison Brothers Mall Entertainment for inspection of Virtuality equipment.
1994 cover letter from Horizon Entertainment accompanying the 1000CS Service Manual.
1992 instructions from Ascension explaining how to change the PROMs on Bird or Flock of Birds.
Amiga startup error codes from The Transactor.
1994 cover letter from Horizon Entertainment accompanying the 1000CS Service Manual.
1992 instructions from Ascension explaining how to change the PROMs on Bird or Flock of Birds.
Amiga startup error codes from The Transactor.
Let the gathering begin...
I'm beginning a project to scan and post documentation on Virtuality.
Let me acknowledge first a few of those who have gone before me. These are great resources if you are trying to make sense of Virtuality systems.
Skullspace
Arianchen
VRtifacts
Mellotts
Let me acknowledge first a few of those who have gone before me. These are great resources if you are trying to make sense of Virtuality systems.
Skullspace
Arianchen
VRtifacts
Mellotts
Subscribe to:
Posts (Atom)